Naviate Pipe December release news 2023

1 min. readlast update: 01.12.2026

Changes are available in Naviate Pipe 2024.2

Modify Single Pipe

A new command to edit elevation, slope for a single pipe with the option to adjust connected pipes. The dialog can stay open while editing and with the arrow-buttons you can move to the next connected pipe. The Elevation box can handle addition and subtraction so you can both move a pipe end to an absolute elevation as well as a relative value.

Rename Pipes by Structure names

A new command that renames selected pipes or all pipes in a network by what structure the pipe is connected to. The pipes can get optional prefix, interfix or suffixes along with the structure names.

Offset in Structure

Now includes a Reset option. This can be used before a corridor is rebuilt to get a better result.

Modify Multiple Pipes

The command can now handle selection both upstream and downstream along the pipe span.

Fixes

  • Fixed an issue in Modify Multiple Pipes where Pick (Elevation) calculates wrong if the pipe is already below the point selected and Below is used as option again.
  • Fixed an issue where Modify Multiple Pipes calculation didn’t skip Null Structures
Was this article helpful?